3 ring traveling circuit
I thought we were trying to avoid hasslee and spending $
1.) load test new found spare voltage source @ local auto parts store to verify if battery is not just something you have to keep until HAZMAT pickup day.
2.) Fully charge extra battery b4 next day on the water.
3.) Place battery into boat, preferably where it won't arc, along with 1/2" wrench, (or 10mm depending on your clamps), and flat blade screwdriver.
4.) Enjoy a day on the water
If your main battery goes dead, ...
total cost 0:cheers:
I thought we were trying to avoid hasslee and spending $

1.) load test new found spare voltage source @ local auto parts store to verify if battery is not just something you have to keep until HAZMAT pickup day.
2.) Fully charge extra battery b4 next day on the water.
3.) Place battery into boat, preferably where it won't arc, along with 1/2" wrench, (or 10mm depending on your clamps), and flat blade screwdriver.
4.) Enjoy a day on the water

total cost 0:cheers: