Joel_CA
Member
Now that the boating season is over for us, I spent the weekend finishing up a flooring project that I started the end of last season. Replaced the plywood center section over the fuel tank, as well as the plastic section over the ski locker.. with 1piece 3/4” marine board glassed and gelcoated to match the rest of the floor. Pretty happy with the results.