AKnarrowback
Well-Known Member
My first try at a youtube posting.
This is the river I did all my DOO work on. I would do PDIs (new machine set ups) the day before on 5-6 machines and test run them the next day. The first run was always the best because the water was always smooth and I would run the river by the reflection off the water. The shop I worked at is the three door white building on the left one turn up from the double bridges about half way through the video.